Naval Air Station, Millington
Exterior Improvements
Department of the Navy
Naval Facilities Engineering Command
Millington, Tennessee
Naval Facilities Engineering Command
Millington, Tennessee
Legend: Magenta- building has been demolished Cyan- renovation Red- roof replacement Orange- renovation and roof replacement Yellow- new construction |
In and open-ended contract with the Department of the Navy, the Horrell Group worked on many renovation/rehabilitation projects, including the following:
|
Gymnasium Arch Repair
One of the more interesting projects for the Department of the Navy, was the repair of the arches at the gymnasium. This building housed several full sized basketball courts. The structure was made up of laminated wood arches at 16 feet on center, spanning 110'-0." The 2'-3" x 7" arches were 44 feet tall at their center. The arches were exposed to high levels of moisture from the boiler room, as well as, to termites, which led to deterioration at the base of the arches. The solution was to temporarily shore the arches, remove the damage portion of arch, and replace it with a metal prosthetic.
One of the more interesting projects for the Department of the Navy, was the repair of the arches at the gymnasium. This building housed several full sized basketball courts. The structure was made up of laminated wood arches at 16 feet on center, spanning 110'-0." The 2'-3" x 7" arches were 44 feet tall at their center. The arches were exposed to high levels of moisture from the boiler room, as well as, to termites, which led to deterioration at the base of the arches. The solution was to temporarily shore the arches, remove the damage portion of arch, and replace it with a metal prosthetic.